Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0825-01506
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/09/2025 | Commercial Building Standard | APPROVED | |||
| 08/25/2025 | Commercial Electrical Standard | APPROVED | |||
| 09/04/2025 | Site Zoning Standard | APPROVED | |||
| 08/21/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the Outdoor Lighting. | ||
| 08/29/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 09/09/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/04/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Clarify why sink PL1F does not have a direct connection. Reference: Sections 301.3 and 802.1, IPC 2018. 2. Clarify the relationship of the 2” combination waste and vent fixture drain from sink PL1F, the existing 2” fixture drain (?) for the existing floor sink and the 2” branch drain. Reference: Section 901.2.1, IPC 2018. 3. Verify the size and total number of fixture units that will be served by the combination waste and vent referenced in keynote #1, on P1.2. Reference: Section 905.2.2, IPC 2018. |
||
| 09/04/2025 | Commercial Mechanical Standard | REVIEW COMPLETED | |||
| 09/02/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 08/13/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 09/04/2025 | Water - PDSD Standard | REVIEW COMPLETED |