Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0825-01459
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/15/2025 | Commercial Electrical Standard | APPROVED | |||
| 08/27/2025 | Commercial Plumbing Standard | APPROVED | |||
| 08/14/2025 | Outdoor Lighting Standard | APPROVED | |||
| 08/26/2025 | Water - PDSD Standard | APPROVED | |||
| 08/27/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/27/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Please amend occupancy type to S-2 from U as this would appear to be appropriate for a non-residential parking garage. IBC 311.3 2. Please indicate the meaning of the dashed areas in Bay 9 IBC 107.2.1 3. Please provide a list of the required special inspections on the cover sheet. IBC 107.2.1 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 08/27/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Revise the sequence of operation for the restroom exhaust fans, EF-1 and EF-2, so that all of the air supplied to the restrooms will be exhausted (i.e. all of the air supplied to each restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2018. | ||
| 08/25/2025 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-0825-01459 Location: 1050 E 19TH ST Review Date: 8/25/2025 Site Engineering Comments: 1. As the Development Package (DP) TD-DEV-0825-00205 has not been approved, site engineering cannot review the plans for compliance. Site Engineering will review the building plans for compliance with the DP once the DP has completed its review and been approved. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
||
| 08/27/2025 | Site Zoning Standard | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-0825-01459 - TD-DEV-0825-00205 1050 E 19TH ST. - I-1 General Manufacturing – Building Addition (1st Review) TRANSMITTAL DATE: August 27, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the I-1 zone (UDC 4.7.29). General Manufacturing is an approved use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.5.C.2, .6, .7, & .8 and 4.9.13.Q. 1. As Development Package TD-DEV-0825-00205 has not completed its first review Zoning will not review the building plans for compliance with the DP and will review once the DP has completed its first review. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 08/25/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 08/06/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |