Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-0824-01679
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/05/2024 | Commercial Electrical | APPROVED | |||
| 09/05/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/05/2024 | Site Engineering | REQUIRES RESUBMIT | 1. Ensure parking dimensions comply with UDC 7.4.6. 2. See zoning comments |
||
| 08/30/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0824-01679 7424 E SPEEDWAY BL. – O-3 New 200 amp electric service with 2 new EV chargers (1st Review) TRANSMITTAL: August 30, 2024 Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in O-3 Zone (UDC 4.7.15). Multifamily is an allowed use in the zone (UDC Table 4.8-3). 1. Clearly demonstrate that the EV station do not reduce the vehicle parking space length to less than 18’-0”. 2. It appears that the electrical service entrance equipment & panel is eliminating a vehicle parking space. If a space is eliminated either provide the last approve site plan that demonstrates that there is at least one (1) additional parking space on site or provide a vehicle parking space calculation that demonstrates that there are sufficient parking on site. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 08/29/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |