Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0824-01624
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/14/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/14/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 10/9/2024 9:53:22 PM Building(B) Reviewer (from previous submittal TUC9592001.082124) Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 8/24/2024 10:28:56 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 10/11/2024 10:07:05 AM 1. (UNRESOLVED) - General - Provide Heat Load calculations. Include O/A in the Calculations. - 2015 IECC Section C403.2.1 Calculation of heating and cooling loads. i. COMcheck for RTU-1 shows 102 (MBH) Heat Load Calculations show 58 (MBH). Confirm Heat Load Calculations. - 2018 IECC - C403.3.1 Equipment sizing (Mandatory). 2. (RESOLVED) - Plan Sheet M0.02 - Provide on the RTU Schedule Total BTUH, Sensible BTUH, and Latent BTUH. Al values must meet COMcheck Mechanical Compliance Certificate submitted and Heat Load Calculations. - 2015 IECC Section C103.2Information on construction documents - 2018 IBC – Section [A]107.2.1Information on construction documents. 3. (RESOLVED) - Plan Sheet M2.02 - If applicable. Provide clear dimensions from all serviceable equipment to the edge of building on roof. (RTU #3, DSCU 1, DSCU-2) - 2018 IMC Section [BE] 304.11 Guards. Electrical(E) Reviewer (from previous submittal TUC9592001.082124) Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 8/29/2024 10:32:56 AM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 10/13/2024 5:54:08 PM Second Plumbing Review: OK Resolved_1). PLAN PAGE P3.01: Drinking fountain symbol in wrong location on both riser diagrams. Correctly Identify the Drinking fountain location. -2018 IPC 106.3.1 |
||
10/04/2024 | PDSD Application Completeness | REVIEW COMPLETED |