Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0824-01624
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/17/2024 | Site Zoning | APPROVED | |||
09/19/2024 | Water - PDSD | APPROVED | |||
09/09/2024 | Site Engineering | NOT REQUIRED | |||
09/19/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/05/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 8/31/2024 11:44:21 PM 1. GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response to all comments may not be reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments. 2. GENERAL - SPECIAL INSPECTIONS: Detail 2/S2.01 indicates that Special Inspections of the soil conditions are required on this project. Please have the Registered Design Professional in Responsible Charge of this project complete and return the City of Tucson Special Inspections Certificate with signatures. The form can be downloaded at: https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-developmentservices/documents/special_inspection_certificate.pdf 3. S1.01 - COLUMN LOCATION: The concrete spread footing below rooftop mechanical unit "RTU-1" is not currently shown centered on the HSS round post. Please confirm that this was intentional and that the foundation has been designed for eccentric loading. 4. S1.10 - RTU LOCATIONS: Please confirm the final placement of rooftop mechanical units "RTU-2" and "RTU-3". The Mechanical Roof New Work Plan, M2.02, indicates that these units shall be located south of Gridline 4 and 2, respectively. This conflicts with the structural Roof and Foundation Plans. Please coordinate final RTU support between disciplines and resubmit. 5. S1.01 - DESIGN ASSUMPTIONS: The 2018 International Building Code, Section 1603 lists all design information that must be included in the construction documents. Information on the wind and seismic design has been provided in the structural general notes, Sheet S1.01. However, it is recommended that the Roof Live Load used for the evaluation of the existing structure be provided in the general notes in addition to appearing in the Structural Calculations, Page 2 of 42. Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Approved Reason: Date Completed : 8/24/2024 10:28:56 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 9/3/2024 5:31:32 PM 1. General - Provide Heat Load calculations. Include O/A in the Calculations. - 2015 IECC Section C403.2.1 Calculation of heating and cooling loads. 2. Plan Sheet M0.02 - Provide on the RTU Schedule Total BTUH, Sensible BTUH, and Latent BTUH. Al values must meet COMcheck Mechanical Compliance Certificate submitted and Heat Load Calculations. - 2015 IECC Section C103.2Information on construction documents - 2018 IBC – Section [A]107.2.1Information on construction documents. 3. Plan Sheet M2.02 - If applicable. Provide clear dimensions from all serviceable equipment to the edge of building on roof. (RTU #3, DSCU 1, DSCU-2) - 2018 IMC Section [BE] 304.11 Guards. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 8/29/2024 10:32:56 AM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 9/5/2024 12:09:51 PM First Plumbing Review: 1). PLAN PAGE P3.01: Drinking fountain symbol in wrong location on both riser diagrams. Correctly Identify the Drinking fountain location. -2018 IPC 106.3.1 |
||
09/19/2024 | Fire New Construction | REVIEW COMPLETED | |||
08/21/2024 | PDSD Application Completeness | REVIEW COMPLETED |