Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0824-01579
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/12/2024 | Site Engineering | APPROVED | Previously Reviewed and commented under MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) | ||
| 09/11/2024 | Water - PDSD | NOT REQUIRED | Previously Reviewed and commented under MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) | ||
| 09/12/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) | ||
| 08/13/2024 | Commercial Electrical | PENDING ASSIGNMENT | Previously Reviewed and commented under MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) | ||
| 08/13/2024 | Commercial Structural | PENDING ASSIGNMENT | Previously Reviewed and commented under MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) | ||
| 08/13/2024 | Fire New Construction | PENDING ASSIGNMENT | Previously Reviewed and commented under MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) | ||
| 08/13/2024 | Site Zoning | PENDING ASSIGNMENT | Previously Reviewed and commented under MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) | ||
| 09/11/2024 | Commercial Mechanical | REQUIRES RESUBMIT | Previously Reviewed and commented under MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) 1. The guards for the service platforms shall extend not less than 30” beyond the ends of the ends of the equipment being serviced. Reference: Section 304.11, IMC 2018. [Initial comment: Provide service platforms and guards for roof mounted equipment. Reference: Section 306.5.1 IMC 2018.] 2. Comment not addressed. [Initial comment: Condensate drains may not terminate at or over a plumbing vent. Condensate drains shall be terminated at an approved disposal location. Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson and Section 901.4, IPC 2018.] 3. The dryer vents are still shown as rectangular ducts on MP1.0. [Initial comment: Verify that the partition containing the dryer vent is constructed with 2” x 6” studs (wall type 3 is not defined). Revise the depiction of the dryer vent on MP1.0 to show a 4” diameter vent, not a rectangular vent. Reference: Sections 504.1, 504.2, 504.4 and, 504.6, IMC 2018.] |
||
| 09/11/2024 | Commercial Plumbing | REQUIRES RESUBMIT | Previously Reviewed and commented under MASTER SET LOCATED AT: TC-COM-0624-01088 (3315 N EUCLID AV TUCSON, AZ 85719) with review(s) to be performed for permit(s): TC-COM-0824-01579 (3317 N EUCLID AV TUCSON, AZ 85719) 1. Only one supply entrance to the building is shown. Provide a water supply entrance to each dwelling unit with a full-open valve for the unit or explicitly call for each fixture (including the showers) to be equipped with stop valves. [Initial comment: Show the locations of the water service entrance to the duplex. Provide a full-open valve for the water supply entrance to each dwelling unit unless each fixture is equipped with stop valves. Reference: Section 606.1(6), IPC 2018.] 2. The new design shows both dwelling units served by one gas meter and gas being supplied to the heat pumps. Ignoring the heat pumps which don’t need gas service, the ¾” gas main is undersized for the total load. [Initial comment: Clarify the natural gas distribution to both units of the duplex. Show the appliance loads, the pipe sizes, and the developed pipe length from the meter to each gas-fire appliance. Reference: Section 107.2.1, IBC 2018 and Sections 402.1 and 402.3, IFGC 2018.] |
||
| 08/13/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |