Permit Number: TC-COM-0824-01568
Parcel: 10610005D

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0824-01568
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/16/2024 Water - PDSD APPROVED
09/16/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
08/28/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 8/26/2024 2:54:37 PM
1. General: Include the window and door schedules specifying the U-Factors. (2018 IBC section 107, 2015 IECC section C402)
2. Sheet X1: Include the uses of the adjacent spaces and required rated separation details per 2018 IBC Table 508.4 as applicable.
3. Sheet X1.1: Specify if fire alarms are installed. (2018 IBC section 107)
4. Sheet A7: The Keynote marks do not correspond to the building section details. Please coordinate and correct notes and all affected details. (2018 IBC section 107)
5. Sheet A7: Include the envelope insulation details meeting the requirements of the 2018 IECC section C402.




Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 8/27/2024 10:48:32 AM
1. General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED certifying agency can be
used. - 2018 IECC Section C403.3.2 HVAC equipment performance requirements.
2. General - Provide Heat load calculations - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads
3. General - Provide Specifications/Schedule for the existing RTU. - 2018 IECC Section C103.2Information on construction documents - 2018 IBC – Section [A]107.2.1Information on construction documents.






Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 8/17/2024 12:12:15 PM





Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 8/28/2024 12:12:16 AM
First Plumbing Review:
1). Plan Page P1: plan set missing development package for trench drain piping & continuation of sump piping as stated. Provide develop package for trench drain piping & continuation of sump piping to termination, as stated. -2018 IPC 106.3.1
2). Plan Page P1: missing sump tank vent. Add sump tank vent. -2018 IPC 712.3.2
3). Plan Page P1: Sump pump discharge piping needs check valve and shut off valve. Add a detail showing Sump pump discharge piping check valve and shut off valve. -2018 IPC 712.2
4). Plan page A5: Missing downspout & gutter locations. Add the 5 downspouts & gutter illustrations to the plan page. -2018 IPC 106.3.1
5). Plan page A5: Plan page A5 states discharge roof downspouts to exterior trench drain. Provide develop package for trench drain piping & continuation of sump piping to termination to determine what system this exterior trench drain discharges to. -2018 IPC 1101.3
09/13/2024 Fire New Construction REQUIRES RESUBMIT Address SAFEbuilt comments. Please provide additional information regarding storage (layout, commodities, height, etc.)
Questions: patricia.shelton@tucsonaz.gov
09/12/2024 Site Engineering REQUIRES RESUBMIT 1. The associated development package TD-DEV-0724-00210 must be approved before this building permit can be approved.

Mike Ortiz
michael.ortiz@tucsonaz.gov
09/10/2024 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0824-01568 - TD-DEV-0724-00210
2020 W PRINCE RD Unit: 150 – I-1
Demolition of showroom and addition of warehouse in reduced foot print (1st Review)

TRANSMITTAL: September 10, 2024
This site is located in I-1 Zone (UDC 4.7.29), Commercial Storage use is an allowed use in the zone (UDC Table 4.8-5) subject to Use Specific Standards 4.9.10.A and 4.9.13.Q.

1. As DP TD-DEV-0724-00210 has not completed its 1st review Zoning cannot review the building plans for compliance.

2. Zoning cannot approve this plan until the DP is approved by all review agencies.

COMMENTS: the following comments are relative to an application for Architectural Documentation prior to demolition of historic buildings (UDC 3.12.1).

The Pima County Assessor’s effective construction date for your building or structure is 1966. The actual construction date may be earlier.
Buildings, portions of buildings or structures that are 50 years of age or older must be architecturally documented prior to demolition. Documentation will be reviewed and approved by the Historic Preservation Office before a permit is issued.
Demolition (Historic and Older Structures) Application and General Information may be downloaded (PDF) at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/planning-amp-zoning/historic_demolition_application_form.pdf
Submit completed documentation under the permit number via TDC Online. Applicant will be contacted within 5 working days if additional materials are required for review.
Historic review must be completed prior to approval of this permit.
If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
08/14/2024 PDSD Application Completeness REVIEW COMPLETED