Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0824-01551
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/21/2024 | Commercial Electrical | APPROVED | |||
| 08/22/2024 | Site Zoning | APPROVED | |||
| 08/27/2024 | Site Engineering | NOT REQUIRED | |||
| 08/27/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/22/2024 | Commercial Building | REQUIRES RESUBMIT | For inquiries on comments email ekulik@willdan.com 1. Sheet TS1 Correct the code addition of the plans. City of Tucson has adopted the 2018 I Codes and the 2017 NEC. Revise drawings as necessary. 2. Sheet A1.0 Provide Occupancy of the suite next door? 3. Sheet A1.1 The Demising wall is required to have 5/8 Drywall both sides. 4. Sheet A1.2 Show the required accessible path of travel to the accessible parking and public way. Per the IBC and ICC A117 5. Sheet A1.8 Show dimensions on enlarges restrooms floor plan. 6. Sheet E3.0 Provide lighting at required exit. |
||
| 08/22/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Sheet M2.0 Show the required outside air. (EK) 2. Sheet M2.0 Are the Heat Pumps existing or new? (EK) |
||
| 08/22/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Sheet P1.0 Provide a detail for repairing the slab at new underground Plumbing. (EK) | ||
| 08/19/2024 | Fire New Construction | REVIEW COMPLETED | |||
| 08/09/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |