Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0824-01509
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/09/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
09/25/2024 | Commercial Electrical | REQUIRES RESUBMIT | Permit Review TC-COM-0824-01509 (7825 E SPEEDWAY BL TUCSON, AZ 85710) 2nd Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. The grounding electrode system required in NEC 690.47 is in addition to any other grounding electrode system required elsewhere in the code. The continuous ground from the modules to the existing grounding electrode system does not meet the requirements of this section. 2. Provide a Grounding Electrode System at the detached structure supporting the solar modules per NEC 690.47. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
10/09/2024 | Commercial Structural | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter to address each of the comments indicating how the Building Review comments were addressed. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. 1. Please provide structural evaluation, design, construction drawings, and calculations prepared by an Arizona licensed design professional for the connection of the PV system to the building and resistance to uplift and lateral wind loads. IBC 107.2.7 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
09/10/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |