Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0823-02101
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/09/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/08/2025 | Air Balancing/Commissioning Report (Deferred Submittal) Express | REQUIRES RESUBMIT | Ventilation systems shall be balanced by individuals holding current certification from the Associated Air Balance Council (AABC), the National Environmental Balancing Bureau (NEBB) or other approved agencies. Reference: Section 403.3.1.5, IMC 2018, as amended by the City of Tucson. | ||
| 05/09/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please provide a special inspection certificate with the list of special inspections matching the special inspection required by the Structural Engineer of Record. IBC 107.2.1For example, Sheet S1.1- SPECIAL INSPECTIONS: #2 States in part; ‘Special inspections for reinforcing steel, structural masonry and anchor bolts shall be performed…’ The provided special inspection certificate lists Pier Foundation, Concrete and Structural Steel (High Strength Bolting and Field Welding). Please revise the special inspection certificate to include Structural Masonry and the Special Inspector’s name and resubmit. Further, what is meant by Pier Foundations and where are they located on this project? Are they on the certificate in error? Please provide the 56-day break results for Report Number: 291280 Inspection Date: 3/10/2025 as the 28 day was less than the specified design strength. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 05/09/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | PIER FOUNDATION Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please provide a special inspection certificate with the list of special inspections matching the special inspection required by the Structural Engineer of Record. IBC 107.2.1For example, Sheet S1.1- SPECIAL INSPECTIONS: #2 States in part; ‘Special inspections for reinforcing steel, structural masonry and anchor bolts shall be performed…’ The provided special inspection certificate lists Pier Foundation, Concrete and Structural Steel (High Strength Bolting and Field Welding). Please revise the special inspection certificate to include Structural Masonry and the Special Inspector’s name and resubmit. Further, what is meant by Pier Foundations and where are they located on this project? Are they on the certificate in error? Please provide the 56-day break results for Report Number: 291280 Inspection Date: 3/10/2025 as the 28 day was less than the specified design strength. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 05/09/2025 | Other Inspection Reports (Deferred Submittal) Express | REQUIRES RESUBMIT | STRUCTURAL STEEL - HIGH STRENGTH BOLTING Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please provide a special inspection certificate with the list of special inspections matching the special inspection required by the Structural Engineer of Record. IBC 107.2.1For example, Sheet S1.1- SPECIAL INSPECTIONS: #2 States in part; ‘Special inspections for reinforcing steel, structural masonry and anchor bolts shall be performed…’ The provided special inspection certificate lists Pier Foundation, Concrete and Structural Steel (High Strength Bolting and Field Welding). Please revise the special inspection certificate to include Structural Masonry and the Special Inspector’s name and resubmit. Further, what is meant by Pier Foundations and where are they located on this project? Are they on the certificate in error? Please provide the 56-day break results for Report Number: 291280 Inspection Date: 3/10/2025 as the 28 day was less than the specified design strength. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 05/09/2025 | Welding Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | STRUCTURAL STEEL Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please provide a special inspection certificate with the list of special inspections matching the special inspection required by the Structural Engineer of Record. IBC 107.2.1For example, Sheet S1.1- SPECIAL INSPECTIONS: #2 States in part; ‘Special inspections for reinforcing steel, structural masonry and anchor bolts shall be performed…’ The provided special inspection certificate lists Pier Foundation, Concrete and Structural Steel (High Strength Bolting and Field Welding). Please revise the special inspection certificate to include Structural Masonry and the Special Inspector’s name and resubmit. Further, what is meant by Pier Foundations and where are they located on this project? Are they on the certificate in error? Please provide the 56-day break results for Report Number: 291280 Inspection Date: 3/10/2025 as the 28 day was less than the specified design strength. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 05/06/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |