Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0823-02101
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/01/2024 | Site Engineering | APPROVED | |||
01/10/2024 | Site Zoning | APPROVED | |||
02/01/2024 | Water - PDSD | REQUIRES RESUBMIT | An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide the civil plans showing the installation of the water service to the building as part of the building plan set. Reference: Sections 107.2.1 and 107.2.6, IBC 2018. [Initial comment: Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018.] | ||
01/12/2024 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Approved with Comments Reason: Date Completed : 9/11/2023 4:24:12 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/11/2023 2:24:15 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 9/13/2023 8:51:34 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 9/13/2023 12:43:18 PM Electrical Review of TWC By: Ron Ross PE E1.1 Electrical 1st Floor Power Plan: Circuit L2:23 not shown. E1.2 Electrical 1st Floor HVAC Plan: Keynote # 2 calls for a motor rated switch at 120 volts, but circuit is 277 volts. Correct or coordinate. E3.2 Electrical Panelboard Schedules: Panel L3 does not match One Line which shows 225 Amp MCB. Correct/Coordinate. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 1/10/2024 9:01:04 PM Second Plan review: Resolved-1). Elevated Water heater detail #5 on plan page P2.1 needs to include a pan & drain. -IPC 504.7 Resolved-2). Urinals throughout plumbing pages need to illustrate partitions same as toilets - IPC 405.3.5 Resolved-3). Plan page A1.4 needs to show downspout locations. -IPC 1101.2, 1106.3 Resolved-4). Plan page A1.4 needs to include Gutter & downspout sizes along with calculations -IPC 1106.1, 1106.3, 1106.6 |
||
01/05/2024 | PDSD Application Completeness | REVIEW COMPLETED |