Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0823-02101
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/02/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/14/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 9/11/2023 4:24:12 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/11/2023 2:24:15 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 9/13/2023 8:51:34 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Conditionally Approved Reason: Date Completed : 9/13/2023 12:43:18 PM Electrical Review of TWC By: Ron Ross PE E1.1 Electrical 1st Floor Power Plan: Circuit L2:23 not shown. E1.2 Electrical 1st Floor HVAC Plan: Keynote # 2 calls for a motor rated switch at 120 volts, but circuit is 277 volts. Correct or coordinate. E3.2 Electrical Panelboard Schedules: Panel L3 does not match One Line which shows 225 Amp MCB. Correct/Coordinate. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 9/12/2023 10:29:50 PM First Plan review: 1). Elevated Water heater detail #5 on plan page P2.1 needs to include a pan & drain. -IPC 504.7 2). Urinals throughout plumbing pages need to illustrate partitions same as toilets - IPC 405.3.5 3). Plan page A1.4 needs to show downspout locations. -IPC 1101.2, 1106.3 4). Plan page A1.4 needs to include Gutter & downspout sizes along with calculations -IPC 1106.1, 1106.3, 1106.6 |
||
09/14/2023 | Site Engineering | REQUIRES RESUBMIT | 1. The permit cannot be approved until its associated development package, TD-DEV-0223-00141, has been approved. Lianne Evans lianne.evans@tucsonaz.gov |
||
09/20/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Iman Monshizadeh PDSD Zoning Review Section PROJECT: TC-COM-0823-02101 – Industrial office Building Plan Review (1st Review) 1109 W Glenn St / I-1 Zone TRANSMITTAL DATE: 09/20/2023 1.COMMENT: Zoning has reviewed the building plans for compliance with the associated Development Package TD-DEV-0223-00141. Zoning cannot approve the building plans until the DP is approved. 2. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the Development Package. 3. COMMENT: Once the plans have been reviewed and approved by PDSD Commercial Plan Reviewers and zoning has verified consistency with the DP, the building plans can be approved by zoning. Resubmittal instructions: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf If you have any questions about this transmittal, Contact Iman Monshizadeh at (520) 837-4082 or by email Iman.Monshizadeh@tucsonaz.gov |
||
10/02/2023 | Water - PDSD | REQUIRES RESUBMIT | Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 107.2.1, IBC 2018. | ||
09/20/2023 | Fire New Construction | REVIEW COMPLETED | |||
08/31/2023 | PDSD Application Completeness | REVIEW COMPLETED |