Permit Number: TC-COM-0823-02097
Parcel: 13213113B

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2

Permit Number - TC-COM-0823-02097
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/06/2026 Elevator Inspection (Deferred Submittal) Express REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0823-02097
ADDRESS: (820 E TUCSON MARKETPLACE BL TUCSON, AZ 85713)

Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed.


COMMENTS:
1. ELEVATOR SHOP DRAWINGS
a. Thank You for submitting the above document.
2. ELEVATOR INSPECTION
a. However, the Elevator Inspection by The Industrial Commission of Arizona was not submitted
b. The actual field inspection report was not submitted.
3. Please resubmit.
Should you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976.
01/05/2026 Concrete Installation Inspection (Deferred Submittal) Express REVIEW COMPLETED
01/05/2026 Masonry Inspection (Deferred Submittal) Express REVIEW COMPLETED
01/02/2026 PDSD Application Completeness Express REVIEW COMPLETED
01/05/2026 Post-Installed Anchor Inspection (Deferred Submittal) Express REVIEW COMPLETED
01/05/2026 Post-Tension Inspection (Deferred Submittal) Express REVIEW COMPLETED
01/05/2026 Special Inspection Certificate Review (Deferred Submittal) Express REVIEW COMPLETED