Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-0823-02097
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/06/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/06/2026 | Elevator Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0823-02097 ADDRESS: (820 E TUCSON MARKETPLACE BL TUCSON, AZ 85713) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. COMMENTS: 1. ELEVATOR SHOP DRAWINGS a. Thank You for submitting the above document. 2. ELEVATOR INSPECTION a. However, the Elevator Inspection by The Industrial Commission of Arizona was not submitted b. The actual field inspection report was not submitted. 3. Please resubmit. Should you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976. |
||
| 01/05/2026 | Concrete Installation Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 01/05/2026 | Masonry Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 01/02/2026 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 01/05/2026 | Post-Installed Anchor Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 01/05/2026 | Post-Tension Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 01/05/2026 | Special Inspection Certificate Review (Deferred Submittal) Express | REVIEW COMPLETED |