Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0823-02094
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/22/2025 | Commercial Mechanical Standard | APPROVED | Mechanical (M) Reviewer Keith Miller; kmiller@safebuilt.com Discipline Status:Approved As Is Date Completed: 12/20/2025 The mechanical review is approved. Subject to the field inspector’s approval. |
||
| 12/22/2025 | Commercial Plumbing Standard | APPROVED | Plumbing (P) Reviewer Keith Miller; kmiller@safebuilt.com Discipline Status:Approved As Is Date Completed: 12/20/2025 The plumbing review is approved. Subject to the field inspector’s approval. |
||
| 12/31/2025 | Outdoor Lighting Standard | APPROVED | Approved with notes added to Sheet E-201. | ||
| 12/19/2025 | Site Engineering Standard | APPROVED | |||
| 01/08/2026 | Water - PDSD Standard | APPROVED | |||
| 01/09/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 12/22/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Structural (S) Reviewer Keith Miller; kmiller@safebuilt.com Discipline Status:Approved As Is Date Completed: 12/20/2025 The structural review is approved. Subject to the field inspector’s approval. Building (B) Reviewer Keith Miller; kmiller@safebuilt.com Discipline Status:Denied Date Completed: 12/20/2025 1.Sheets G-000, G-003 / Floor Plan / Incorrectly calculated occupant load.The concentrated occupant area (standing) at 1 occupant per 5sf is to be calculated using the floor space up to the ordering counter. The break room with tables and chairs is to be calculated at 1 occupant per 15sf. Correct and coordinate the occupant load calculations, plumbing fixture count, and egress calculations on sheet G-003 with the load specified on sheet G-000. (2018 IBC section 1004) 2.Sheet A-604 / Architectural interior elevations / The revised interior elevations were not provided in the revised set. Provide the full set of sheets affected by the revisions. (2018 IBC section 107) |
||
| 12/22/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical (E) Reviewer Keith Miller; kmiller@safebuilt.com Discipline Status:Denied Date Completed: 12/20/2025 1.Sheet E-201A / Dining Power Plan / Inconsistent layout.The electrical panels and room do not match the design shown on other sheets. Correct and coordinate all drawings. (2018 IBC section 107) 2.Sheet E-204 / Roof Power Plans / Missing roof receptacles.Show the locations of the rooftop maintenance receptacles as referenced in Keynote #6 and Panel D circuit #24. (2017 NEC section 210.63) 3.Sheet E-302 / Single Line Riser Diagram / Missing the date of revision #5. Includethe date of revision #5 in the title block. (2018 IBC section 107) |
||
| 01/09/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-COM-0823-02094 – TD-DEV-0123-00102 3605 E. Broadway Blvd. Tucson, AZ 85716 Chic-Fil-A Remodel (1st Review) TRANSMITTAL DATE: 1/9/2026 This site is located in the C-2 zone (UDC 4.7.21). Food Service is a permitted use subject to Use Specific Standards 4.9.4.M.1 and 4.9.13.P. Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: While the plans appear to match TD-DEV-0123-00102, Site Zoning cannot approve this permit until the associated Development Package has been approved by all review agencies. 2. Comment: Additional comments may be forthcoming on the next review based on the plans submitted and responses to zoning review comments. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 01/08/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 12/18/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |