Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-0823-02094
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/09/2026 | Commercial Electrical Standard | APPROVED | Electrical (E) Reviewer Keith Miller; kmiller@safebuilt.com Discipline Status:Approved As Is Date Completed: 2/9/2026 The electrical review is approved. Subject to the field inspector’s approval. |
||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 02/09/2026 | Commercial Building Standard | REQUIRES RESUBMIT | uilding (B) Reviewer Keith Miller; kmiller@safebuilt.com Discipline Status:Denied Date Completed: 2/9/2026 1.Unresolved - Sheets G-000, G-003 / Floor Plan / Incorrectly calculated occupant load.The concentrated occupant area (standing) at 1 occupant per 5sf is to be calculated using the floor space up to the ordering counter. The break room with tables and chairs is to be calculated at 1 occupant per 15sf. Correct and coordinate the occupant load calculations, plumbing fixture count, and egress calculations on sheet G-003 with the load specified on sheet G-000. (2018 IBC section 1004) i.Classification (2-9-26): The occupant load listed on sheet G-000 under Building Data does not match the calculated occupant load. 2.Resolved - Sheet A-604 / Architectural interior elevations / The revised interior elevations were not provided in the revised set.Provide the full set of sheets affected by the revisions. (2018 IBC section 107) |
||
| 02/05/2026 | PDSD Application Completeness Express | REVIEW COMPLETED | REVIEW 2; SEE REVISE PERMIT WORKFLOW DATED 12/18/2025. THIS REVIEW STARTED DUE TO WORKFLOW ISSUE. |