Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0823-02055
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/25/2023 | Water - PDSD | APPROVED | |||
| 09/25/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/31/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/31/2023 6:38:24 PM See the building review comments Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/31/2023 6:35:02 PM 1) General: Provide roof rainwater disposal system drawings and details. (2018 IPC section 1101.2) 2) General: Include the gas piping layout, diagram, and calculations. (2018 IBC section 107) 3) General: The foundation perimeter insulation is not shown on the wall or foundation section views as required by 2018 IECC section C402.2.4 2) Sheets S2.1 and S3.1 (Foundation Plans): Include the footing dimensions and depths and coordinate the details with the architectural plans. (2018 IBC section 1809) 3) Sheet P3.1 (Plumbing Details): Show the faucet details meeting the automatic controls as required by 2018 IPC amended section 412.11 and 419.6. 5) Sheet P3.1 (Plumbing Details): Include the drainage fixture unit calculations. (2018 IBC section 107) Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/31/2023 6:37:07 PM See the building review comments. No mechanical revisions are needed at this time. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/31/2023 6:36:18 PM See the building review comments. No electrical revisions are needed at this time Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/31/2023 6:37:49 PM See the building review comments. |
||
| 09/13/2023 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
| 09/07/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-COM-0823-02055 7500 E VOYAGER RD Zoning RX-1 TRANSMITTAL DATE:‎September 7, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1. COMMENT: Zoning has reviewed the building plan for compliance with DP21-0067, Zoning cannot approve the building plans until the DP is approved. COMMENT: Zoning will review the building plans on the next submittal as it relates to the zoning review purview and compare the building plan footprint, building height, and square footage and location to ensure consistency with the DP. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
| 09/07/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 08/24/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |