Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.5
Permit Number - TC-COM-0823-02054
Review Name: COMMERCIAL REVIEW - FULL v.5
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/08/2024 | Site Engineering | APPROVED | |||
| 02/08/2024 | Bldg Permits - Post Review Express | REVIEW COMPLETED | |||
| 02/07/2024 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 11/30/2023 6:52:35 PM Building(B) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 2/7/2024 1:34:56 AM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 9/20/2023 9:07:22 AM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 9/19/2023 9:17:55 AM Electrical Review of Super Star Car Wash By: Ron Ross PE E1.0 SITE PLAN: Missing Keynote 10. E1.1 SITE LIGHTING & POWER PLAN: Missing Keynote, 5 & 6 used in details 1&2. E2.0 LIGHTING & POWER PLAN: Missing Keynote 5 or mis-identified and should be Keynote 3. Could not locate Power Keynotes 4 & 5. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved with Comments Reason: Date Completed : 2/5/2024 10:04:54 PM Third plumbing review: OK Subject to Field Inspections Resolved-1). plan set missing site utility piping plan pages C4.1, C4.2, C4.3 -IPC 106.3.1 Resolved-2). Plan set missing 11 of the 14 plumbing pages shown on plan page T1.0 -IPC 106.3.1 Resolved-3). Oil interceptor on plan pages P1.0 & P1.1 needs to be vented -IPC 1003.9 Resolved-4). Commercial Washing machine needs lint interceptor on plan page P1.1 -IPC 1003.6 5). Resolved-The 2.5 " carwash connection on plan page P1.2 needs its own RPZ backflow -IPC 608.1** there needs to be an additional RPZ Backflow on the car wash line separate from the RPZ on main water @ bldg entrance ** Resolved-6). Water line to mat wash needs RPZ backflow on plan page P1.2 - IPC 608.1 Resolved-7), Washing machine on plan pages P1.2 & P1.3 needs to be piped with hot water. -IPC 607.1 8). Resolved- Roof drain riser diagram on plan page P1.1 only shows 2 sets of roof drains, Roof plan on same page shows 3 sets. Diagrams need to correlate -IPC 106.3.1 Resolved-9). Roof drain riser diagram on plan page P1.1 needs to show the total GPM load at each set of roof drains, and each point of interconnection & termination. -IPC 1106.2 Resolved-10). Can't do complete plumbing review until all plan pages are present -IPC 106.3. |
||
| 02/01/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |