Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-0823-02033
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/31/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/31/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. The description of the scope of work states, “ Install new 2 ton package system”. Per phone conversation with the applicant. Aneeza Garcia @ Rite Way Heating, the units are new and replacing swamp coolers. 1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, calculations, and sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements |
||
| 08/31/2023 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Provide the U.S. Government Energy Guide that shows the proposed split-system AC unit has a SEER2 energy efficiency of 14.3 or greater. Split-system air conditioners that do not meet the new M1 Standards published by the Department of Energy cannot be installed after January 1, 2023. The new 2023 Standards for units <45,000 BTUH are 14.3 SEER2 which is equivalent to 15 SEER. 2. Electrical load calculations are required for services less than 150 Amp. |
||
| 08/22/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |