Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0823-02017
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/15/2023 | Site Engineering | APPROVED | |||
| 12/04/2023 | Site Zoning | APPROVED | |||
| 11/22/2023 | Water - PDSD | APPROVED | |||
| 12/18/2023 | Bldg Permits - Post Review Express | REVIEW COMPLETED | |||
| 11/27/2023 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 11/22/2023 2:50:06 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 10/9/2023 5:10:50 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 10/10/2023 11:33:10 AM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 9/2/2023 2:47:13 PM Electrical Review of WoodSpring Suites By: Ron Ross PE E-1: Panels G404 thru G418 are missing destination/source feeds as compared to Panel G419 thru G436. Arrows shown may not be required. Clarify/correct as required. E-5: Keynotes 6 and 8 not properly shown. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 10/12/2023 11:11:21 PM Second Plumbing Review:OK 1). Resolved-Need to Address Bldg. plan review comments 3, 4. 7 & 8. -IPC 403.1, 1106.3, 1106.5, 1108 2). Resolved-Add Roof GPM loads that each set of scuppers & downspouts will be responsible for along with sizing calculations to Plan page A1.3 -IPC 1106.1, 1106.3, 1106.5, 1108 3). Resolved-Plan page M- 2 Detail 2 shows independent wall exhaust & intake for gas water heaters, detail 5 on same shows single concentric wall termination? Plan page needs to correlate. -IFGC 106.3 4). Resolved-Plan page M-2 detail single combustion air louver for gas dryers will need to be within 12" of ceiling -IFGC 304.6.2 5). Resolved-Gas meter location on plumbing floor plan page P-4 isn't clear -IFGC 106.3.1 6). Resolved-Add gas sizing table used to plan page P-6, -IFGC 402.3 7). Resolved-show the P12 trench drain on plan pages P-2 & P-5 -IPC 106.3.1 8). Resolved-Plan Page P1 note #1 is stating carrier toilets? the models selected & Plan page P5 riser diagram don't correlate with carrier toilet rough in style. -IPC 106.3.1 9).Resolved- Coffee water line note #20 on Plan page P4 needs to include an ASSE 1022 or 1024 backflow -IPC 608.17.1.2 10). Resolved-The P11 hose bibs on plan page P-4 need individual shut off valves -IPC 606.2 |
||
| 11/21/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |