Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.4
Permit Number - TC-COM-0823-02013
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/29/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/29/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/29/2023 1:28:27 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/29/2023 1:26:32 PM 1. Resolved – Sheet A6A: Include the newly framed wall, door, and windows in the envelope proof of energy compliance. (2018 IECC section C402) The COMcheck shows both cavity and continuous R-19 insulation. The plans do not show any continuous insulation on the walls. 2. Resolved - General: Include the elevation views of the altered wall and patio dining area. (2018 IEBC section 106.2) 3. Resolved - Sheet DP1 (Building Details): The proposed patio is 536 sf but the building, restaurant, and patio areas in the calculations are for 1132 sf. Please clarify or correct the calculations. (2018 IEBC section 106.2) 4. Resolved - Sheet A4 (Floor Plan): Show the fire rating details of the existing separation walls between the restaurant addition and the adjacent office spaces. (2018 IBC Table 508.4) Sheet A4 references detail #9 on sheet A6A but there is not a detail #9. 5. Resolved - Sheet A7 (Accessibility Details): Show the toilet center line distance to the wall. (2009 ICC A117.1 section 602.4) 6. Resolved - Sheet A7 (Accessibility Details): Include the table accessibility details. (2009 ICC A117.1 section 902) 7. Unresolved - Sheet M1 (Mechanical Drawings): Include the new kitchen equipment schedule and specification sheets. (2018 IEBC section 106.2) Appliance BTU's are still not included in the equipment schedule on sheet A5 (not A4) to be used in the gas piping size calculations and the new equipment specification sheets for the 4-burner range were still not submitted. 8. Resolved - Sheet P1 (Plumbing Diagram): Show the toilet vent pipe size. The toilet drain is shown being reduced from 3" to 2". (2018 IPC Table 710.1(1) note a) The requested revisions were not made on the isometric diagram. Please show the plumbing fixtures connected to the grease trap and signage as detailed in the amended 2018 IPC section 1003.3. Mechanical(M) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/29/2023 1:27:45 PM See the building review comments. Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/29/2023 1:27:23 PM See the building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 9/29/2023 1:28:05 PM See the building review comments. |
||
09/28/2023 | PDSD Application Completeness | REVIEW COMPLETED |