Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0823-01992
Parcel: 10821328B

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.4

Permit Number - TC-COM-0823-01992
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/06/2023 Water Sterilization Report (Deferred Submittal) APPROVED
12/06/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
12/06/2023 Air Balancing/Commissioning Report (Deferred Submittal) REQUIRES RESUBMIT Comment not addressed. Provide a review of the air balance report by the responsible engineer. [Second comment: The air flow quantities presented as design airflow quantities to each space do not match the design drawings. Provide a review by the responsible engineer.] [Initial Comment: The design information reported for FC-1, FC-2, and FC-3 does not match the information shown on the approved drawings. If the information on the drawing is incorrect, indicate on the drawing the correct information for the diffusers (e.g. number of diffusers and to which fan coil they are connected).]
12/05/2023 PDSD Application Completeness REVIEW COMPLETED