Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0823-01965
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/22/2023 | Site Zoning | APPROVED | |||
| 09/14/2023 | Water - PDSD | APPROVED | |||
| 08/17/2023 | Site Engineering | NOT REQUIRED | |||
| 09/14/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/05/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 9/5/2023 5:33:43 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 8/16/2023 6:15:43 PM 1. Sheet A-0.1: An increased occupant load is being requested as permitted by Section 1004.5.1. Provide a narrative as to the reasoning for the increased occupant load and clear description of the space. 2. General: No site plan has been provided. Provide an architectural site plan. 3. General: Provide within the site plans, drawings that clearly indicate the accessible routes within the site and site arrival points that connect the accessible parking to the accessible entrances that are in accordance with Section 206.2.1 and 206.2.2. 4. Provide evidence of compliance that 60% of the public entrances are accessible in accordance with Section 206.4.1. 5. Provide evidence of compliance that at least one restricted entrance is accessible in accordance with Section 206.4.7. Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 8/18/2023 5:25:25 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 8/29/2023 4:44:22 PM Electrical Review of Zeal By: Ron Ross PE E601 ELECTRICAL ONE LINE DIAGRAM: The single line does not look correct. Please call out the Existing generator size and ATS. Currently it is drawn as a 1200-amp ATS and 350 KW Generator, but your ?? emergency panel EB-L?? is only 100 amps. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 8/27/2023 10:57:19 PM First Plumbing Review: OK |
||
| 08/17/2023 | Fire New Construction | REQUIRES RESUBMIT | -If egress doors are being controlled by access key pads, indicate which method of compliance will be used. IFC 1010.1.9.9 or 1010.1.9.10 john.vincent@tucsonaz.gov 5203495581 |
||
| 08/15/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |