Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0823-01960
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/11/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
10/11/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer) Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 8/31/2023 7:34:01 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 10/9/2023 1:43:19 PM Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Denied Reason: Date Completed : 10/8/2023 1:01:36 AM 1. Provide mechanical schedule showing all new mechanical appliances MC2018,106.3.1) Complied 2. Provide ventilation calculations (IMC2018,403.3.1.1.1) Complied 3. Provide return air to each room (IMC2018,603) Complied 4. Provide mechanical exhaust to both bathrooms (IMC2018,403.3.1.1) Complied 5. Show how you are bringing in fresh outside air to heat pump air handler (IMC2018,403.1) Complied Please see additional corrections below 6. You are required to exhaust 70 CFM of exhaust air to public restrooms you are exhausting 50 please correct (IMC2018,403.3.1.1) 7. Make up air shall be provided at approximately the same as exhaust air in repair bay (IMC2018,501.4) Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 10/9/2023 6:19:54 PM 2nd Electrical Review of Sunbelt Rentals By: Ron Ross PE Need to provide service receptacle for new HVAC system (Mech units 1 &2) . Need to call out for weather proof GFCI service receptacles to be installed next to units to comply with NEC 210.63 requirement. Need to provide an interior lighting Comcheck to show IECC 2018 compliance. Using new fixtures should pass, but calculations are required by Tucson to prove compliance. May need to provide lighting controls on a timer/motion detector to meet the current energy codes for lighting. Will need to provide occupancy/vacancy sensor light switch controls for offices. Comment only: All new panels have the more costly 22 KAIC rating, but your calculations show less than 4,600 amps maximum fault currents for any of the new panels. Why not use standard (and more common and stocked) 10 KAIC rated panels? Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 10/10/2023 10:19:12 PM Second Plumbing Review: 1). Resolved-Need to address building plan review comments 1 & 2 -IPC 106.3.1, 403.1 2). Unresolved -Plumbing Scope not clear -IPC 106.3.1 No response 3). Unresolved -Add water heater(s) manufacture name and model numbers to plan page P1 -IPC 303, 501.5 No response 4). Unresolved - on plan page P1 need asse 1070 mixing valves -IPC 419.5 No response |
||
10/05/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |