Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0823-01959
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/11/2023 | Site Zoning | APPROVED | |||
| 08/17/2023 | Site Engineering | NOT REQUIRED | |||
| 08/17/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/17/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/15/2023 5:02:34 PM Pending the building review comments. No structural revisions needed at this time. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/15/2023 4:55:43 PM 1) Sheet CV.0 (Cover sheet): Incorrect energy code shown. The plans are to be designed based on the 2018 IECC. 2) Sheet E1.0 (Electrical Drawings): Include the location and details of the electrical panel supplying power to the new circuits. 2018 IBC section 107 3) Sheet P1.0 (Plumbing Drawings): Include the water supply piping/tubing diagrams and details to the beverage machines. Show the floor sink traps with the DWV piping diagrams. 2018 IBC section 107, 2018 IPC section 1002 Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/15/2023 5:01:02 PM See building review comments. Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/15/2023 5:01:23 PM See building review comments. |
||
| 08/13/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 08/10/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |