Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0823-01958
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/07/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/07/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/6/2023 8:46:18 AM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/6/2023 8:44:50 AM Only one revised sheet was submitted. The file named "TCCOM082301958 - Tie-Downs - Amtex Installation Manual_v1" only includes the responses to the review comments. 1) Resolved - Sheet A0.0 (Cover Sheet): Include the allowed vs actual area, height, and number of stories. (2018 IBC Chapter 5) 2) Unresolved - Sheet P1.1 (Underground Plumbing Drawings): The underground sewer and water main piping are shown under the building support piers shown on sheet #9. The piping depth is not detailed. Please revise the plans based on the final foundation plans to be submitted. (2018 IPC section 305) No revised plans submitted. 3) Unresolved - Sheet #7 (Elevation Views): An accessible building entrance and steps are not shown on the elevation views. Please revise all affected sheets. (2018 IBC sections 1106, 1011, 1012, 1014) No revised plans submitted. 4) Unresolved - Sheet #9 (Foundation Drawing): The foundation pier drawing is noted that it is for reference only and a separate site-specific installation plan is required. Please submit a geotechnical engineer report and foundation plans including the anchoring/tie-down drawings. (2018 IBC sections 107, 1803) The foundation shown in the structural calculations still includes 2500psf soil bearing capacity was used in addition to 1000psf note. Please coordinate the architectural/structural details and submit the final foundation construction drawings with all pier/footing dimensions and details. Include the anchoring/tie-down drawings. Mechanical N/A Electrical(E) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/6/2023 8:45:23 AM See the building review comments Plumbing(P) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 11/6/2023 8:46:00 AM See the building review comments. |
||
| 11/03/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |