Permit Number: TC-COM-0823-01956
Parcel: 119044450

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.3

Permit Number - TC-COM-0823-01956
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/11/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/11/2023 Commercial Mechanical REQUIRES RESUBMIT The Department of Energy defines “installation” of a central air conditioner as connection of the refrigerant lines and /or the electrical systems to make the central air conditioner operational. If the split system air conditioners were operational prior to 1/1/23, submit a letter to that effect along with a copy of the complete plan set and all supporting documentation (e.g. load calculations, Mech check, etc.) for approval. [Initial comment: Split System Air Conditioners (including ductless) that do not meet the current energy efficiency requirements (14.3 SEER2, 11.7 EER2) cannot be installed on or after January 1, 2023. All such equipment not operational on January 1, 2023, must have an Energy Guide label identifying a SEER2 or SEER2/EER2 rating.]
08/31/2023 PDSD Application Completeness Express REVIEW COMPLETED