Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0823-01927
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/09/2023 | Site Zoning | APPROVED | |||
09/11/2023 | Water - PDSD | APPROVED | |||
08/15/2023 | Site Engineering | NOT REQUIRED | |||
09/11/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/15/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/15/2023 3:26:20 PM See the building review comments. Building(B) Reviewer Keith Miller kmiller@safebuilt.com Denied Reason: Date Completed : 8/15/2023 3:25:43 PM 1) General: Include the energy code compliance details meeting the envelope requirements of 2018 IECC section C402. 2) Sheet G0.0 (Cover Sheet): Include the occupancy group classification, construction type, occupant load of lower level using the means of egress, codes and wind loads used in the design. 2018 IBC section 107. 2) Sheet A2.1: Show the ramp slope, vertical rise height, width, and railing meeting the means of egress requirements of 2018 IBC section 1012. 3) Sheet S3.1: Section details do not include the framing lumber sizes and the sheathing plywood type and thickness. The porch rafters are shown being spaced 32" o.c. which exceeds the spacing limits of 2018 IBC section 2308.7.2, include the sheathing details in the section views and structural calculations. 4) Sheet S2.1: Include foundation dimensions on the foundation plans or detail the sheet number and detail where the design details can be found. The porch footings do not specify where to find the dimensions and the other notes reference the sections on Sheet S3.1 but the sections do not provide the concrete, framing, and lumber dimensions or reference the sheets that have the details. 5) Sheet S2.1 and A1.1: Include the work area and structure dimensions on the proposed structure. 2018 IBC section 107. Mechanical N/A Electrical N/A Plumbing N/A |
||
08/13/2023 | Fire New Construction | REVIEW COMPLETED | |||
08/08/2023 | PDSD Application Completeness | REVIEW COMPLETED |