Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0726-01214
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/25/2026 | Commercial Building Standard | APPROVED | |||
| 08/19/2026 | Commercial Electrical Standard | APPROVED | Approved with notes added to plans. | ||
| 08/25/2026 | Commercial Plumbing Standard | APPROVED | |||
| 08/25/2026 | Site Zoning Standard | APPROVED | |||
| 08/19/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 08/05/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 08/25/2026 | Water - PDSD Standard | NOT REQUIRED | |||
| 08/25/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/25/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0726-01214 ADDRESS/PARCEL: 115 W LIMBERLOST DR Unit:BLDG 7 UNIT 7104 TUCSON, AZ 85705 Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov. COMMENTS: 1. In order to use reduced ventilation rates, ducted outdoor air must be provided to the dwelling unit. It appears that no ducted outdoor air is being provided to the air handler. If ducted outdoor air is provided to the return side of the air handler and the system is balanced, Exception 2 may be applicable. Please clarify. Reference: Section 403.3.2.1, IMC 2024. 2. The plans identify a ducted hood with an exhaust of 100 CFM, while also indicating a 180 CFM kitchen ventilation fan. Please clarify. Reference: Section 107.2.1, IBC 2024. |
||
| 08/17/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 08/05/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |