Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0726-01198
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Commercial Building | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction | PENDING ASSIGNMENT | |||
| N/A | Site Zoning | PENDING ASSIGNMENT | |||
| 08/03/2026 | Site Engineering | REQUIRES RESUBMIT | Permit Activity Number: TC-COM-0726-01198 (1st Review) Project: PROJECT CONSISTING OF: (8) WALL BRACKETS & (2) SAILS, PROVIDING APPROX. (1,878) TOTAL SQUARE FEET OF SHADE Location: 5420 E BROADWAY BL Review Date: 8/3/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Reviewer Contact: Marco.contreras@tucsonaz.gov Related cases: Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed to ensure final approval from Site Engineering. To help speed up your resubmittal and facilitate shorter review timelines, please include a response letter along with your updated plans and any supporting calculations. In your response letter, address each comment individually and explain what changes were made and where they can be found in the plans. Please do not mark or highlight changes in the drawings at this stage — revision markups are only used after a permit has been issued. Submit your response letter and updated plan set as two separate files. Site Engineering Review Comments: 1. Site Engineering has completed its review of the submitted building plan set and cross-referenced it against the associated Development Package. However, final approval of this Commercial permit cannot be granted until the associated submission of the Development Package TD-DEV-0726-00209 has received full approval and has been issued. Per UDC §3.3.3.G, building permits for sites requiring a Development Package may not be issued prior to DP approval, as the building plans must be consistent with an approved site plan. Please resubmit for final approval once the Development Package has been approved and issued by all applicable reviewers. |
||
| 07/31/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |