Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0726-01170
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Commercial Building Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Electrical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Mechanical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| N/A | Fire New Construction Standard | PENDING ASSIGNMENT | |||
| N/A | Outdoor Lighting Standard | PENDING ASSIGNMENT | |||
| N/A | Water - PDSD Standard | PENDING ASSIGNMENT | |||
| 10/15/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TC-COM-0726-01170 (2nd Review) Project: CONVERTING THE EXISTING COMMERCIAL PROPERTY INTO A FOOD TRUCK PARK/FOOD COURT. Location: 702 S STONE AV Review Date: 10/15/2026 Reviewer: John Mounsey – Engineering Associate Reviewer Contact Information: john.mounsey@tucsonaz.gov Site Engineering Comments: 1. Development Package Required: The proposed improvements at this commercial site requires the submittal of a Development Package (site plan) in accordance with UDC §7.4.3.E. Per UDC §3.3.3.G.2.c, a Development Package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites must be submitted and approved. The Development Package is a separate submittal from the building plans and must be processed independently. 2. Site Engineering Review: Site Engineering is unable to fully review and approve permit TC-COM-0726-01170 until the associated Development Package has been submitted, reviewed and approved by all applicable reviewers. 3. Please resubmit for final approval once the development package has been approved and issued by all applicable reviewers. For final approval - Ensure that all building plans match what is shown in the development package plan set. |
||
| 10/14/2026 | Site Zoning Standard | REQUIRES RESUBMIT | 1. COMMENT: As indicated in the pre-application conference for this project, TP-PRE-0626-00130, a separate development package (DP; site review) is required to be submitted and approved before Site Zoning can provide final approval to this building permit. All sheets in this permit that demonstrate site work -- including the site plan, IPP sheet, site utility work, and zoning code analysis should be included as part of the DP. Please review DP submittal requirements at https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-8767 to ensure formatting and content is complete. 2. COMMENT: The proposed Individual Parking Plan (IPP) must be submitted as a "subrecord" to the DP permit. Reach out directly to Mark Castro at mark.castro@tucsonaz.gov regarding the process for, and questions about, submitting an IPP. The IPP will be reviewed and approved on the DP. 3. COMMENT: Ensure the DP includes all proposed site improvements and their dimensions and details, including dumpster enclosures, parking areas, and fences/walls. 4. COMMENT: Final approval of this building permit cannot be granted until the associated Development Package is first submitted and approved. Contact Fernando Garcia, Lead Planner, Site Zoning at fernando.garcia2@tucsonaz.gov. |
||
| 10/08/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |