Permit Number: TC-COM-0726-01092
Parcel: 14002002C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.5

Permit Number - TC-COM-0726-01092
Review Name: COMMERCIAL REVIEW - FULL v.5
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
10/26/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/26/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0726-01092 (4350 E IRVINGTON RD TUCSON, AZ 85714)
5th Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC), 2012 Outdoor Lighting Code (OLC).
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/building-code/2012_outdoor_lighting_code_.pdf

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

>>> The original review comments were not addressed. Provide updated plans and comment response letter addressing review comments.

1. Provide the correct code references on the provided plans. Show compliance with the currently adopted codes.
2. Provide Ground-Fault Protection of Equipment for the 1200A Switchboard, per NEC 230.95.
3. Reference Sheet EV02.1, Wire Tag #2 and 'EV Main Service' main breaker. The provided conductor sizes are undersized for the given 1200A main breaker. NEC 240.4.
4. Reference Sheet EV02.2, Pannelboard 'EV' Schedule, circuits 7,9,11. The line diagram on sheet EV02.1 shows this connection from 'EV' to Panel EV3 with a 600A C/B. Please correct and show consistent information.

Provide updated plans as a single file.
10/12/2026 Addressing Validation REVIEW COMPLETED
10/12/2026 PDSD Application Completeness Express REVIEW COMPLETED