Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0725-01441
Parcel: 132130530

Address:
755 E 44TH ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - LIMITED v.3

Permit Number - TC-COM-0725-01441
Review Name: COMMERCIAL REVIEW - LIMITED v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/16/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/16/2025 Site Engineering REQUIRES RESUBMIT Permit: TC-COM-0725-01441
Location: 755 E 44TH ST
Review Date: 9/16/2025
Site Engineering Comments:
1. Site Engineering will be unable to approve permit TC-COM-0725-01441 until the associated development package is submitted for this development and is approved by all reviewers. Per UDC Article 3.3.3.G.2.c
If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
09/09/2025 Site Zoning REQUIRES RESUBMIT PDSD ZONING REVIEW TRANSMITTAL

FROM:
Bobby Parsons
PDSD Site Zoning Section Review

PROJECT: TC-COM-0725-01441
755 E 44th Street Tucson, AZ 85713 ; I-1
New Shade Structure (2nd Review)

TRANSMITTAL DATE: 9/9/2025

Resubmit a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in the I-1 zone (UDC 4.7.29).

1. Comment: Previous comment 1 not addressed. Per UDC Article 3.3.3.G.2.c, a site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A Development Package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. The DP will need to be approved prior to zoning approval of this building permit.

If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.
09/02/2025 PDSD Application Completeness Express REVIEW COMPLETED