Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1
Permit Number - TC-COM-0725-01409
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/28/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/28/2025 | Commercial Mechanical Express | REQUIRES RESUBMIT | 1. Replacement of commercial AC units constitutes new work so the submittal will require a heating/cooling load calculation to justify the capacities of the units being installed (Sections C403.3.1 and C403.2.2, IECC 2018). While ventilation calculations are not required, a test and balance report is required to verify that the total supply airflow and the outside airflow are at least equal to that which the previous AC unit provided. Reference: Section C503.4, IECC 2018. 2. The minimum internal pipe diameter for condensate drains is ¾”. Reference: Section 307.2.2, IMC 2018. 3. Condensate drains may not terminate over a roof drain or gutter unless the roof drain or gutter terminates at or below grade in an area capable of absorbing the condensate flow without surface drainage. Reference: Section 307.2.1, IMC 2018, as amended by the City of Tucson. |
||
| 07/25/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |