Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0725-01395
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/11/2025 | Site Zoning Standard | APPROVED | |||
| 08/07/2025 | Commercial Electrical Standard | NOT REQUIRED | No changes to the electrical. | ||
| 08/13/2025 | Commercial Mechanical Standard | NOT REQUIRED | |||
| 08/13/2025 | Commercial Plumbing Standard | NOT REQUIRED | |||
| 07/23/2025 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 08/01/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 08/13/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/13/2025 | Commercial Building Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0725-01395 ADDRESS/PARCEL: (331 E 7TH ST TUCSON, AZ 85705) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. COMMENTS: 1. Please correct the occupant load calculation. Per IBC Table 1004.5, Exhibit Gallery requires 30 net sf per person. Please correct you occupant load calculation and total. 2. Art Retail Area: Please do a separate calculation for the art retail areas. 3. The majority of the spaces are occupancy A3 with accessory M for the art retail areas. Please make this correction. a. Please verify and implement the fire requirements. 4. Please provide an Egress Plan with attention to the connection from the middle space to the space on the left where a rear door is being used to access the left space from the middle space. Please be clear on the travel distances (show/indicate this information on the floor plan). 5. Please redo your minimum plumbing fixture calculation. Per your cover sheet, only one restroom is required. 6. POS counter: Please provide drawing meeting the accessible requirements. a. ICC A117.1 for both Employees and Customers. The tops work surfaces 902.4: shall be 28 inches min and 34 inches max above the floor. Parallel approach 904.3.2: the public use side of the counter surface 36 inches in length minimum. Forward approach 904.3.3: the public use side of the counter surface 30 inches minimum in length. Knee clearance 306.3: between 9 inches and 27 inches above the floor. Maximum depth 306.3.2: extend 25 inches maximum under an element at 9 inches above the floor. Minimum depth 06.3.3: Where clear floor space complying with Section 305, the knee clearance shall be 11 inches minimum in depth at 9 inches above the floor, and 8 inches minimum in depth at 27 inches above the floor. 7. Water Dispenser: Please note the following requirements. a. Per city amendment 410.4 in the IPC. i. The water dispenser must be connected to a permanent supply of potable water. ii. A permanent mounted disposable cup dispenser shall be installed to the cooler. 8. Plumbing review not required should existing to remain with no alteration made. 9. Please resubmit. If you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976 |
||
| 08/07/2025 | Fire New Construction Standard | REQUIRES RESUBMIT | -Please review occupancy classifications. Per IFC 203.2.8, art galleries are considered an A-3 occupancy. This is possibly a mixed use A3/M. john.vincent@tucsonaz.gov 5203495581 |
||
| 07/22/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |