Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0725-01372
Parcel: 10705117C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.5

Permit Number - TC-COM-0725-01372
Review Name: COMMERCIAL REVIEW - FULL v.5
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
11/03/2025 Commercial Building Standard APPROVED
10/14/2025 Commercial Electrical Standard APPROVED
10/21/2025 Commercial Mechanical Standard APPROVED
10/14/2025 Outdoor Lighting Standard APPROVED Approved with the following Pre-issuance Condition added:
An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf
11/03/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
10/21/2025 Commercial Plumbing Standard REQUIRES RESUBMIT The Arizona Administrative Code requires at least 36” of clearance for the sides of the lined hot water heater (the use of the manufacturer’s clearance requirements is subject to approval by an authorized Arizona boiler inspector). The specified water heater has a bottom side inlet and will require the installation of a vacuum relief valve. Provide a detail showing the installation of the water heater. [Initial comment: Lined water heaters with a heat input of 200,000 BTU per hour or more, an operating water temperature of 210º F or greater, or a nominal water containing capacity of 120 gallons or more are required to comply with the rules contained in Article 4 (Arizona Boilers and Lined Hot Water Heaters) of the Arizona Administrative Code. https://www.azsos.gov/rules/arizona-administrative-code#ID20
11/03/2025 Fire New Construction Standard REVIEW COMPLETED
10/13/2025 PDSD Application Completeness Express REVIEW COMPLETED