Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.5
Permit Number - TC-COM-0725-01372
Review Name: COMMERCIAL REVIEW - FULL v.5
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/03/2025 | Commercial Building Standard | APPROVED | |||
| 10/14/2025 | Commercial Electrical Standard | APPROVED | |||
| 10/21/2025 | Commercial Mechanical Standard | APPROVED | |||
| 10/14/2025 | Outdoor Lighting Standard | APPROVED | Approved with the following Pre-issuance Condition added: An Outdoor Lighting Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate_odl.pdf |
||
| 11/03/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/21/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | The Arizona Administrative Code requires at least 36” of clearance for the sides of the lined hot water heater (the use of the manufacturer’s clearance requirements is subject to approval by an authorized Arizona boiler inspector). The specified water heater has a bottom side inlet and will require the installation of a vacuum relief valve. Provide a detail showing the installation of the water heater. [Initial comment: Lined water heaters with a heat input of 200,000 BTU per hour or more, an operating water temperature of 210º F or greater, or a nominal water containing capacity of 120 gallons or more are required to comply with the rules contained in Article 4 (Arizona Boilers and Lined Hot Water Heaters) of the Arizona Administrative Code. https://www.azsos.gov/rules/arizona-administrative-code#ID20 | ||
| 11/03/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 10/13/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |