Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0725-01320
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/28/2025 | Site Zoning | APPROVED | |||
| 07/28/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/23/2025 | Commercial Building | REQUIRES RESUBMIT | July 17, 2025 1st Review Trident Building Solutions, Inc. Attn: Susan Rancifer 8215 Roswell Road, Bldg. 100 Atlanta, Georgia 30350 Re: RADIOLOGY LTD - WILMOT TENANT IMROVEMENT City of Tucson Permit Number: TC-COM-0725-01320 Stantec Project Number: 185215066 Stantec File Number: TUC-25-077 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms N/A N/A 536 N/A N/A N/A Separate Permits: Automatic fire sprinklers and fire alarm. Deferred Submittals: None. Special Inspections: Field welding. ARCHITECTURAL COMMENTS Sheet A0.00 1. Please provide a complete code analysis for the project. The code analysis should include the Occupancy Group for the existing building, construction type, occupant load, if existing fire sprinklers/alarms are installed, etc. [Ref. IBC 2018 Sec. 107.2.1] 2. Note on the cover of the drawings that special inspection is required for field welding. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. 3. Please revise the applicable codes for this project to the 2018 International Codes as adopted by the City of Tucson. The 2024 codes indicated are not what the City of Tucson has currently adopted. STRUCTURAL COMMENTS General 1. Please provide the structural calculations for the structural design. Sheet S1.00 1. The location of the chiller on this sheet conflicts with the locations indicated on the architectural and MEP plan-sets. Please correlate and revise accordingly. 2. Please clarify the chiller curb construction details. The framing plan indicates the RPS Curb is by others, but the mechanical plan-set indicates it will be installed on the existing rails. Please coordinate and revise accordingly. If a new curb is to be installed provide details on installation. {This comment was included in the Mechanical Section as well.} Sheet S2.00 1. The plans indicate the 2024 IBC and IEBC as the applicable codes. Please revise to meet the 2018 IBC and IEBC as adopted by the City of Tucson. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS Sheet M1.01 1. Please include the condensate piping and discharge location for the chiller. [Ref. IPC 2018 Sec. 314.2.1] 2. Please clarify the chiller curb construction details. The framing plan on the structural plan-set indicates the RPS Curb is by others and appears to be new, but the mechanical plan-set indicates it will be installed on the existing rails. Please coordinate and revise accordingly. If a new curb is to be installed provide details on installation. {This comment was included in the Structural Section as well.} ELECTRICAL COMMENTS Sheet E1.01 1. Please provide the MRI equipment supplier drawings as referenced in the electrical plan. 2. Please provide an updated panel schedule and load calculations. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 07/23/2025 | Commercial Electrical | REQUIRES RESUBMIT | July 17, 2025 1st Review Trident Building Solutions, Inc. Attn: Susan Rancifer 8215 Roswell Road, Bldg. 100 Atlanta, Georgia 30350 Re: RADIOLOGY LTD - WILMOT TENANT IMROVEMENT City of Tucson Permit Number: TC-COM-0725-01320 Stantec Project Number: 185215066 Stantec File Number: TUC-25-077 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms N/A N/A 536 N/A N/A N/A Separate Permits: Automatic fire sprinklers and fire alarm. Deferred Submittals: None. Special Inspections: Field welding. ARCHITECTURAL COMMENTS Sheet A0.00 1. Please provide a complete code analysis for the project. The code analysis should include the Occupancy Group for the existing building, construction type, occupant load, if existing fire sprinklers/alarms are installed, etc. [Ref. IBC 2018 Sec. 107.2.1] 2. Note on the cover of the drawings that special inspection is required for field welding. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. 3. Please revise the applicable codes for this project to the 2018 International Codes as adopted by the City of Tucson. The 2024 codes indicated are not what the City of Tucson has currently adopted. STRUCTURAL COMMENTS General 1. Please provide the structural calculations for the structural design. Sheet S1.00 1. The location of the chiller on this sheet conflicts with the locations indicated on the architectural and MEP plan-sets. Please correlate and revise accordingly. 2. Please clarify the chiller curb construction details. The framing plan indicates the RPS Curb is by others, but the mechanical plan-set indicates it will be installed on the existing rails. Please coordinate and revise accordingly. If a new curb is to be installed provide details on installation. {This comment was included in the Mechanical Section as well.} Sheet S2.00 1. The plans indicate the 2024 IBC and IEBC as the applicable codes. Please revise to meet the 2018 IBC and IEBC as adopted by the City of Tucson. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS Sheet M1.01 1. Please include the condensate piping and discharge location for the chiller. [Ref. IPC 2018 Sec. 314.2.1] 2. Please clarify the chiller curb construction details. The framing plan on the structural plan-set indicates the RPS Curb is by others and appears to be new, but the mechanical plan-set indicates it will be installed on the existing rails. Please coordinate and revise accordingly. If a new curb is to be installed provide details on installation. {This comment was included in the Structural Section as well.} ELECTRICAL COMMENTS Sheet E1.01 1. Please provide the MRI equipment supplier drawings as referenced in the electrical plan. 2. Please provide an updated panel schedule and load calculations. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 07/23/2025 | Commercial Mechanical | REQUIRES RESUBMIT | July 17, 2025 1st Review Trident Building Solutions, Inc. Attn: Susan Rancifer 8215 Roswell Road, Bldg. 100 Atlanta, Georgia 30350 Re: RADIOLOGY LTD - WILMOT TENANT IMROVEMENT City of Tucson Permit Number: TC-COM-0725-01320 Stantec Project Number: 185215066 Stantec File Number: TUC-25-077 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms N/A N/A 536 N/A N/A N/A Separate Permits: Automatic fire sprinklers and fire alarm. Deferred Submittals: None. Special Inspections: Field welding. ARCHITECTURAL COMMENTS Sheet A0.00 1. Please provide a complete code analysis for the project. The code analysis should include the Occupancy Group for the existing building, construction type, occupant load, if existing fire sprinklers/alarms are installed, etc. [Ref. IBC 2018 Sec. 107.2.1] 2. Note on the cover of the drawings that special inspection is required for field welding. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. 3. Please revise the applicable codes for this project to the 2018 International Codes as adopted by the City of Tucson. The 2024 codes indicated are not what the City of Tucson has currently adopted. STRUCTURAL COMMENTS General 1. Please provide the structural calculations for the structural design. Sheet S1.00 1. The location of the chiller on this sheet conflicts with the locations indicated on the architectural and MEP plan-sets. Please correlate and revise accordingly. 2. Please clarify the chiller curb construction details. The framing plan indicates the RPS Curb is by others, but the mechanical plan-set indicates it will be installed on the existing rails. Please coordinate and revise accordingly. If a new curb is to be installed provide details on installation. {This comment was included in the Mechanical Section as well.} Sheet S2.00 1. The plans indicate the 2024 IBC and IEBC as the applicable codes. Please revise to meet the 2018 IBC and IEBC as adopted by the City of Tucson. MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS Sheet M1.01 1. Please include the condensate piping and discharge location for the chiller. [Ref. IPC 2018 Sec. 314.2.1] 2. Please clarify the chiller curb construction details. The framing plan on the structural plan-set indicates the RPS Curb is by others and appears to be new, but the mechanical plan-set indicates it will be installed on the existing rails. Please coordinate and revise accordingly. If a new curb is to be installed provide details on installation. {This comment was included in the Structural Section as well.} ELECTRICAL COMMENTS Sheet E1.01 1. Please provide the MRI equipment supplier drawings as referenced in the electrical plan. 2. Please provide an updated panel schedule and load calculations. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 07/21/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 07/14/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |