Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0725-01305
Parcel: 11621017A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0725-01305
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/04/2025 Commercial Plumbing Standard APPROVED
07/30/2025 Site Zoning Standard APPROVED
07/25/2025 Commercial Building Standard NOT REQUIRED
07/21/2025 Fire New Construction Standard NOT REQUIRED
08/04/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/15/2025 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0725-01305 (137 S GRANDE AV Unit:UNIT 1 TUCSON, AZ 85745)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).


1. Please include the electrical for the new HVAC/minisplits as noted in the violation code:
RWOP / Electrical work for laundry and mini split installed, no permit

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
08/04/2025 Commercial Mechanical Standard REQUIRES RESUBMIT The violation report states that a mini split air conditioner was installed without a permit. Provide a heating/cooling load calculation to justify the capacity of the unit being installed (Sections C403.3.1 and C403.2.2, IECC 2018). Provide the specifications for the replacement HVAC unit (e.g. manufacturer, model number, heating/cooling capacity, and efficiency ratings). The replacement units shall have an efficiency rating that is greater than or equal to the minimum required by the Department of Energy that went into effect on January 1, 2023.
07/14/2025 PDSD Application Completeness Express REVIEW COMPLETED