Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.4
Permit Number - TC-COM-0725-01292
Review Name: COMMERCIAL REVIEW - LIMITED v.4
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/26/2025 | Commercial Building | APPROVED | |||
| 09/16/2025 | Commercial Electrical | APPROVED | |||
| 09/23/2025 | Commercial Mechanical | APPROVED | |||
| 09/23/2025 | Water - PDSD | APPROVED | |||
| 09/26/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/23/2025 | Commercial Plumbing | REQUIRES RESUBMIT | Relocation of the lavatories will trigger the need to provide metering faucets and tempered water for the lavatories. 1. The metering faucets shall dispense a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10 seconds for accessibility. Reference: Section 412.11, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Provide tempered water for the lavatories and public hand-washing sinks in restrooms using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018. 3. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. [Initial comment: Provide a plumbing design performed by an Arizona registrant who has demonstrated proficiency through registration, education, technical knowledge, or experience to perform such work. Reference: Sections 107.1 and 107.2.1, IBC 2018.] |
||
| 09/11/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |