Permit Number: TC-COM-0724-01465
Parcel: 106024110

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2

Permit Number - TC-COM-0724-01465
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/11/2025 Water Sterilization Report (Deferred Submittal) Express APPROVED LETTER OF REQUEST TO REMOVE CONDITION
06/12/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/11/2025 Air Balancing/Commissioning Report (Deferred Submittal) Express REQUIRES RESUBMIT LETTER OF REQUEST TO REMOVE CONDITION
The mechanical plan, M1.0, called for the installation of an IAQ fan set and a ducted kitchen hood. The air balancing report is to verify that the fans are operating at the design airflow rates.
06/10/2025 PDSD Application Completeness Express REVIEW COMPLETED
06/12/2025 Post-Installed Anchor Inspection (Deferred Submittal) Express REVIEW COMPLETED LETTER OF REQUEST TO REMOVE CONDITION