Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0724-01434
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/06/2024 | Commercial Electrical | APPROVED | |||
08/07/2024 | Site Zoning | APPROVED | |||
08/16/2024 | Water - PDSD | APPROVED | |||
08/12/2024 | Site Engineering | NOT REQUIRED | |||
08/16/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/16/2024 | Commercial Building | REQUIRES RESUBMIT | For questions in regards to plan review comments, please contact Bill McClellan by email at bmcclellan@willdan.com or cell (928)580-3179. all applicable comments will be followed by the initials (BM) 1. Sheet A1 Provide on plans all ADA required clearance and height requirements / details to verify compliance per ICC A117, Incomplete (BM) 2. Sheet A1 Provide for review life safety and exiting plan to include common path of travel distance, exit sizes and exit configuration to comply with 2018 IBC 1006, 1007, 1016 &1017 (BM) 3. Sheet A1 Suite is identified with a side door on a few plan sheets, clarify door hardware and other elements do not identify door opening as a usable door from either side of wall. 2018 IBC 107.2.1(BM) 4. Sheet A3 Provide for review details and data for ACT ceiling installation to comply with CISCA & ICC/ESR report per manufacture. Incomplete 2018 IBC 808.1 & 107.2.1 (BM) 5. Sheet M1 Provide for review, equipment specification schedule for existing roof top unit and compliance with 2018 IECC . 2018 IBC 107.2.1 (BM) 6. Sheet E2.01 Clarify receptacles along front and side windows. Store front windows require show window receptacles above windows per 2017 NEC 210.62 (BM) |
||
08/16/2024 | Commercial Mechanical | REQUIRES RESUBMIT | |||
08/16/2024 | Commercial Plumbing | REQUIRES RESUBMIT | |||
08/06/2024 | Fire New Construction | REVIEW COMPLETED | |||
07/26/2024 | PDSD Application Completeness | REVIEW COMPLETED |