Permit Number: TC-COM-0724-01419
Parcel: 10603058B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0724-01419
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/22/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/19/2024 Commercial Structural REQUIRES RESUBMIT ACTIVITY NO. TC-COM-0724-01419 ADDRESS/PARCEL: (15 E FORT LOWELL RD TUCSON, AZ 85705) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Review will not proceed without the response letter. COMMENTS: 1. Please submit structural calculations and drawings done by an Arizona licensed structural engineer, documents to bear the engineer’s seal/signature/date signed. 2. Please resubmit.
08/22/2024 Signs REQUIRES RESUBMIT
08/19/2024 Site Engineering REQUIRES RESUBMIT This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.)
Please start a new FUP at our permit application web page:
https://tdc-online.tucsonaz.gov/#/home
NOTE: Documentation of a cost estimate from your contractor will be required if this project involves any reconstruction, repair, rehabilitation, structurally connected addition, or other improvement of an existing structure (including TIs and solar). Construction of separate builds/new structures does not require a cost estimate to be provided. Construction of new buildings require elevation one foot above the base flood elevation, which may require that the foundation of the building be raised as much as two feet above the existing elevation onsite. Storage buildings with no utilities may be wet floodproofed using flood vents. For all new construction buildings, two elevation certificates must be filled out by a registered land surveyor and submitted to the City, one before the foundation is poured and one after construction is completed.
Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”

Mike Ortiz
michael.ortiz@tucsonaz.gov
08/21/2024 Site Zoning REQUIRES RESUBMIT Until approved by all review other review agencies Zoning cannot approve.
08/19/2024 PDSD Application Completeness Express REVIEW COMPLETED