Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0724-01382
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/24/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/03/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer (from previous submittal TUC9581001.071824)
Janet Matz
jmatz@safebuilt.com
Approved with Comments
Reason:
Date Completed : 8/2/2024 5:50:43 AM





Building(B) Reviewer
Janet Matz
jmatz@safebuilt.com
Denied
Reason:
Date Completed : 9/3/2024 1:16:47 AM
1. (General) Please update the title blocks of all sheets to include the date signed by the Architect of record on the seal. RESOLVED.
2. Sheet A1.1 (Life Safety Plan). Note on the drawings that that all alterations shall be done in a manner that maintains the level of fire protection (2018 IEBC Sec. 703.1). RESOLVED.
3. Sheet A1.1 (Life Safety Plan). Clarify that the exit door shown to the right of the proposed recruiting asst. area has enough door clearance to be considered an exit. The angled wall appears to cut the clearance in such a way that the minimum width may not be possible. Show the minimum accessible floor clearance on the plans. (ICC A117.1- 2009
Figure 404.2.3.2).
◦ Not Approved. The exit door in question was eliminated in the resubmittal. The diagonal distance for the concentrated business area is still sufficient however the office space as a whole and the distance between the exit doors does not appear to comply. Please show the overall diagonal distance for the entire office suite and
show that the two remaining exit doors are a sufficient distance apart. (2018 IBC Section 1007.1.1).
◦ In addition, please update the exit occupancy use for each door. The exit door notes both indicate use of 42 occupants for a total of 84 however the actual occupancy load for the suite is 125.
4. Sheet A2.0 (Floor Plan). The Floor plan Key Note 11 indicates a 12” raised platform for the command center area. Provide construction details for this platform and provide information on the step up or ramp that will be needed. RESOLVED.
5. Sheet A3.0 (Reflected Ceiling Plan). The RCP general notes indicate a security system will be installed by the tenant.
Clarify if this will be part of this permit or if a separate permit will be submitted. IF the low voltage work is part of this permit, provide details for its installation on the electrical plans. RESOLVED.
6. Sheet A4.0 (Finish Schedule). Indicate on the Room Finish Schedule that all interior finishes will be in accordance with 2018 IBC Sec. 803.1. RESOLVED.





Mechanical(M) Reviewer (from previous submittal TUC9581001.071824)
Janet Matz
jmatz@safebuilt.com
Approved
Reason:
Date Completed : 8/2/2024 5:51:15 AM






Electrical(E) Reviewer
Janet Matz
jmatz@safebuilt.com
Approved
Reason:
Date Completed : 9/3/2024 1:17:02 AM





Plumbing(P) Reviewer (from previous submittal TUC9581001.071824)
Janet Matz
jmatz@safebuilt.com
Approved
Reason:
Date Completed : 8/2/2024 5:51:00 AM
09/24/2024 Fire New Construction REQUIRES RESUBMIT -Resolve all building comments.
john.vincent@tucsonaz.gov
5203495581
08/28/2024 PDSD Application Completeness Express REVIEW COMPLETED