Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0724-01379
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/04/2024 | External Reviewers - SAFEBuilt | APPROVED | Structural(S) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 11/3/2024 10:04:28 PM Building(B) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 11/3/2024 10:03:44 PM Mechanical(M) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 11/3/2024 10:03:54 PM Electrical(E) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 11/3/2024 10:03:02 PM Plumbing(P) Reviewer Janet Matz jmatz@safebuilt.com Approved Reason: Date Completed : 11/3/2024 10:04:13 PM |
||
| 12/04/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/22/2024 | Site Engineering | REQUIRES RESUBMIT | 1. A development package is required and must be approved before this building permit can be approved. Mike Ortiz michael.ortiz@tucsonaz.gov |
||
| 12/04/2024 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-0724-01379 106 W DELANO ST. – O-3 Multifamily (3rd Review) TRANSMITTAL DATE: December 4, 2024 Resubmit revised drawings with a detailed response letter stating how all Zoning Review Section comments were addressed. 1. This comment was not addressed. The required DP is a separate submittal and shall be approved by all review agencies prior to approval of this building plan. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The Administrative Manual can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes-and-Plans/Zoning-Code#section-1. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 11/19/2024 | Water - PDSD | REQUIRES RESUBMIT | A development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Revise the site plan to show the size of the water meter and the size of the water service pipe to the building. Reference: Sections 107.2.1 and 107.2.6, IBC 2018 [Second comment: Provide the size of the water meter and the size of the water service pipe to the building. Provide tracer wire for non-metallic water service pipe.] [Initial comment: Show the location and size of the proposed water meter and the proposed size, material, and route of the water service pipe on a site plan. Provide tracer wire for non-metallic water service pipe. Reference: Section 107.2.1 and 107.2.6, IBC 2018.] | ||
| 10/24/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |