Permit Number: TC-COM-0724-01377
Parcel: 13014024A

Address:
4202 E 22ND ST

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0724-01377
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/14/2024 Site Zoning APPROVED
08/19/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/05/2024 Commercial Electrical REQUIRES RESUBMIT Permit Review TC-COM-0724-01377 (4202 E 22ND ST TUCSON, AZ 85711)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. This is a commercial project, requiring all documents to be prepared, sealed, signed, and dated by a registered design professional. Provide complete electrical plans, design, and calculations, sealed by an Arizona Registrant. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304, 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements.

2. Show interconnection at the sub-panel C in compliance with NEC 705.12(B)(2)(3) busbars.
3. Provide a warning label per 705.12(B)(2)(3).


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
08/19/2024 Commercial Structural REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter to address each of the comments indicating how the Building Review comments were addressed. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed.
1. Please have licensed design professional provide an evaluation of the existing roof and prepare analysis showing the existing roof can resist the new load of the rooftop PV system. IBC 107.2.7
2. Provide structural design and calculations for the addition of the new rooftop PV system indicating uplift resistance. IBC 107.2.7
3. Provide a list of the year and name of the adopted applicable codes from the adopting ordinance. IBC 107.2.1 For example, 2018 IBC as amended by the City of Tucson. Additionally, See amendment-Section 1609.1.1 Determination of wind loads. REVISE Section by ADDING the following after the last paragraph: Per the Basic Wind Speed Figures, use the following:
Risk Category I – 100 mph
Risk Category II – 105 mph
Risk Category III – 110 mph
Risk Category IV – 115 mph




Please contact me if you have any questions about these comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
08/19/2024 Site Engineering REQUIRES RESUBMIT This project is within a regulated floodplain and requires a Floodplain Use Permit (FUP.) Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home

Instructions:
1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record
2. Locations -> Confirm the location is accurate to the project. Click “Next”
3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next”
4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next”
5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next”
6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next”
7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next”
8. Review and Submit -> Review all information to ensure accuracy. Click “Submit”
Contact __________ at ______________@tucsonaz.gov if you have any questions about the FUP.
NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document.
08/08/2024 Fire New Construction REVIEW COMPLETED
07/18/2024 PDSD Application Completeness Express REVIEW COMPLETED