Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.2
Permit Number - TC-COM-0724-01372
Review Name: COMMERCIAL REVIEW - LIMITED v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/31/2024 | Commercial Building | APPROVED | |||
10/30/2024 | Water - PDSD | APPROVED | |||
10/31/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
10/30/2024 | Commercial Mechanical | REQUIRES RESUBMIT | Per Table 403.3.1.1, IPC 2018, the occupant density of a bar is 100 persons per 1,000 square feet. This gives a population of 54 persons in 540 square feet. In addition, calculation of the required minimum ventilation for air handlers serving multiple zones requires the balancing data (supply CFM) for each zone and the calculations described in Sections 403.3.1.1.2.3.1 through 403.3.1.1.2.3.4, IMC 2018. Reference: Section 403.3.1.1.2.3, IMC 2018. [Initial comment: The occupant load used to calculate the required ventilation is not necessarily the same as the occupant load used for calculating exiting requirements. The occupant load used for calculating the minimum required ventilation is to be based on Table 403.3.1.1, IMC 2018 or an approved engineering analysis of the specific occupancy type. Reference: Section 403.3.1.1, IMC 2018.] | ||
10/30/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. The detail provided does not show the connections to the new wall or verify that the wall itself is capable of supporting the 485-pound water heater. [Initial comment: Provide a design and structural calculations for mounting the water heater and shelf to the building structure. Reference: Section 301.2, IPC 2018.] 2. The architectural plans still call for an “ADA-Compliant single spout drinking fountain.” [Initial comment: The use of a water dispenser in lieu of a drinking fountain requires the installation of a listed and labeled dispenser along with a permanently mounted disposable cup dispenser. The cup dispenser shall be located adjacent to the water dispenser with the dispensing end between 34” and 48” above the finished floor. See: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/2008-21_e_drinkingfountainpolicy.pdf] 3. The revised plumbing plans do not indicate that the distance between the hot water source (the recirculating loop) and the lavatories is a maximum of 24” for a ½”pipe or 6” for a ¾” pipe. The hot water heater piping detail does not indicate the presence of a hot water recirculation loop and no components of a recirculation hot water recirculation loop are specified.. [Initial comment: Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018.] |
||
10/31/2024 | Design Review | REQUIRES RESUBMIT | Design Package under SD-0724-00066 still under review. | ||
10/29/2024 | Site Engineering | REQUIRES RESUBMIT | see zoning comment | ||
10/28/2024 | Site Zoning | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Fernando Garcia Planning & Development Services Department – Zoning Review Section PROJECT: TC-COM-0724-01372 – Tenant Improvement 200 E Congress St, Tucson, AZ 85701 Plan Review (1st Review) TRANSMITTAL DATE: October 28, 2024 This site is zoned OCR-2 (UDC Section 4.7.27). Food service (food court) is a permitted use in OCR-2 subject to use-specific standards 4.9.4.M.1., .6, & .7. 1. (Comment) Final Site Zoning approval of this plan cannot occur until Special Districts Application SD-0724-00066 is approved. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Completion of SD-0724-00066. If you have any questions about this transmittal, please contact Fernando L. Garcia at fernando.garcia2@tucsonaz.gov. |
||
10/16/2024 | Historic | REVIEW COMPLETED | Materials submitted are complete for PRS review. Review is scheduled for 11/14/2024. If you have any questions, contact Michael.Taku@tucsonaz.gov |
||
10/02/2024 | PDSD Application Completeness | REVIEW COMPLETED |