Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0724-01370
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/15/2024 | Commercial Electrical | APPROVED | |||
| 08/19/2024 | Commercial Structural | APPROVED | |||
| 08/19/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/15/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Show the size, route, and termination of the dryer exhaust duct. Reference: Sections 504.1, 504.2, 504.4 and, 504.6, IMC 2018. 2. Verify that the dryer installation complies with Section 504.6, IMC 2018. |
||
| 08/15/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Clarify the plumbing drawing. Provide both water isometrics and waste and vent isometrics. Reference: Section 107.2.1, IBC 2018. 2. Provide pressure-absorbing devices for the water connections to appliances equipped with quick-acting or solenoid valves. Reference: Section 604.9, IPC 2018. 3. Show how the indirect waste receptor will be provided for the washing machine. Provide ready access to the waste receptor. Reference: Section 802.4, IPC 2018. |
||
| 07/17/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |