Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0724-01357
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: In Review
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
N/A | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
N/A | Fire New Construction | PENDING ASSIGNMENT | |||
N/A | Site Engineering | PENDING ASSIGNMENT | |||
N/A | Site Zoning | PENDING ASSIGNMENT | |||
N/A | Water - PDSD | PENDING ASSIGNMENT | |||
01/08/2025 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer (from previous submittal TUC9579001.071624) Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 7/23/2024 9:15:45 PM Building(B) Reviewer Janet Matz jmatz@safebuilt.com Denied Reason: Date Completed : 1/8/2025 12:39:53 AM A complete set of drawings must be provided for approval, not just the sheets that were modified. Please provide all of the sheets for the newly revised set. Mechanical(M) Reviewer (from previous submittal TUC9579001.071624) Jorge Valido jvalido@safebuilt.com Approved with Comments Reason: Date Completed : 7/29/2024 3:32:16 PM 1. General - As per: 232008 CC (Rita Ranch) Tucson, AZ - Project Manual Permit Set - 06-28-2024_v1.pdf - PAINT BOOTH PLANS (Under Separate Review and Permit) Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 1/2/2025 12:35:58 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 1/5/2025 8:59:36 PM Second Plumbing Review: Comments Remain Unresolved-1). Plan Page P1.0: Missing Oil interceptor Vent. Add a vertical oil interceptor vent in accordance with -2018 IPC 1003.9 also see 905.4 Unresolved-2). Plan page P3.1: missing oil interceptor sizing calculations, add sizing calculations in accordance with -2018 IPC 1003.4.2.2 Unresolved-3). Plan page P4.0: Missing ASSE 1070 mixing valve for lavatories. Add ASSE 1070 mixing valve to fixture schedule. -2018 IPC 419.5 |
||
12/31/2024 | PDSD Application Completeness | REVIEW COMPLETED |