Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0724-01341
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/24/2024 | Commercial Electrical | APPROVED | |||
07/19/2024 | Site Zoning | APPROVED | |||
07/31/2024 | Site Engineering | NOT REQUIRED | |||
07/31/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
07/31/2024 | Commercial Building | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter to address each of the comments indicating how the Building Review comments were addressed. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. 1. Please amend plans to show the location of the drinking fountain or the point of use water cooler or dispenser. IBC 2902. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
07/30/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Provide heating and cooling load calculations to justify the addition of the ductless heat pump system. Reference: Section C403.1.1 and C502.2.3, IECC 2018. 2. Revise detail 8/M2.0 to show how the condensate drain lines can be cleared of blockages without cutting the drain line. Reference: Section 307.2.5, IMC 2018. |
||
07/30/2024 | Commercial Plumbing | REQUIRES RESUBMIT | Provide a metering faucet for the lavatory, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. | ||
07/30/2024 | Fire New Construction | REVIEW COMPLETED | |||
07/11/2024 | PDSD Application Completeness | REVIEW COMPLETED |