Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.2
Permit Number - TC-COM-0724-01341
Review Name: COMMERCIAL REVIEW - LIMITED v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/23/2024 | Commercial Building | APPROVED | |||
08/26/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
08/26/2024 | Commercial Mechanical | REQUIRES RESUBMIT | The heating/cooling load calculation for the lobby shows a total cooling load of 16.9 MBH or approximately 1,000 CFM. How does this calculation justify adding a 12.2 MBH heat pump to the lobby when the existing 7.5-ton AC unit however already supplies 900 CFM to the lobby? [Initial comment: Provide heating and cooling load calculations to justify the addition of the ductless heat pump system. Reference: Section C403.1.1 and C502.2.3, IECC 2018.] | ||
08/26/2024 | Commercial Plumbing | REQUIRES RESUBMIT | The revised plumbing floor plan shows a drain and vent being installed at the proposed location of the water dispenser. Will this drain and vent be connected to an indirect waste receiver? The proposed water dispenser does not provide for direct connection to a drain. Reference: Section 107.2.1, IBC 2018. | ||
08/12/2024 | PDSD Application Completeness | REVIEW COMPLETED |