Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0724-01341
Parcel: 12801005H

Review Status: Requires Resubmit

Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1

Permit Number - TC-COM-0724-01341
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
07/08/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
07/08/2025 Water Sterilization Report (Deferred Submittal) Express REQUIRES RESUBMIT The required water disinfection report is incomplete. Your report should include the results of a bacteriological examination by a licensed testing laboratory (e.g., Turner Laboratories) of the water in the distribution system after the chlorine has been purged from the system. Section 610.1 of the 2018 International Plumbing Code describes the testing requirements.
07/07/2025 PDSD Application Completeness Express REVIEW COMPLETED